Call 07942815124 42% Response Rate

Send Email

Our Excellence

2008
  • Outset Of KMM Consultants And Engineers
  • Initiated With Small Scale Residential Projects.
  • Structural And Architectural Designing Started.
2010
  • Project Management Consultancy Services Started
  • Worked With Nagar Panchayat Bhogpur (PMC) For Bus Terminal.
2013
  • Detailed Design and Construction Engineering
  • Worked For Ghaghara River Bridge In Bailia (Dist.)
  • Worked Of Minor Bridges For Punjab Mandi Board
  • Design Drawings For Hospital Building At Ganga Nagar
2015
  • Entry Into Use Of GPS & GIS Techniques
  • Asia’s Biggest Property Survey Using Gps And Gis Techniques (Worked With NDMC & Data World information System Pvt Ltd.)
  • Design Drawings And Expert Field Visit For Lovely Professional University.
  • BRTS Bus Depot Project In Amritsar Bagging Project 450 Crore.
2017
  • KMM Bagged Over 175 Km Of Project Worth 2000 Crore for Dedicated Freight Eastern Corridor.
  • Design Drawings And Expert Field Visit For Cambridge School.
2018
  • Kiranotech Engineering Consultancy Pvt Ltd Came Into Being.
  • Bagged Project Of Amritsar Smart City & Saharanpur Smart City
2019
    •Bagged Lucknow Smart City Project.

     

    •Completion of 33 No’s Junctions Improvement Design Project At Allahabad.

     

    •Development of Integrated Master Plan for Sangaldham Railway Station under Udampur Srinagar-Baramulla (Rail Link Project).

     

    •Junction Improvement And Traffic Signaling Work In Ghaziabad (UP).

     

    •Junction Improvement And Traffic Signaling Work In Meerut (UP).

     

    •Pre-Bid Engineering Services for Development of 6 Laning of Nh-648 in the State Of Karnataka.

     

2020
  • Amritsar BRTS Has Been Shortlisted As Sustainable Transport Award Nominee. (2020 Sustainable Transport Award Nomination

2021

  • Development of Integrated master plan for Salal Railway station under Udampur-Srinagar- Baramulla (Rail link project) for Konkan Railway Corporation Limited.
  • Development of Integrated master plan for Dugga Railway station under Udampur- Srinagar- Baramulla (Rail link project) for Konkan Railway Corporation Limited.
  • Development of Corridor Improvement for Identified Area for 35 Km long stretch in Prayagraj City (U.P)

2022

  • Development of Integrated master plan for Basindadhar Railway station under Udampur-Srinagar- Baramulla (Rail link project) for Konkan Railway Corporation Limited.
  • Detailed Design Consultancy for Development of Sky Walk Plaza on Circular Road along Shaheedan Sahib Gurudwara at Amritsar City
  • Various Development of Road Junctions for G20.
  • Pre-bid services for Redevelopment of Bangalore Railway station as world class railway station worth 455 cr.
  • Design and drawing for the hotel, shop cum office (SCO).
  • Designing of 33 Nos of Tunnels Portals related to USBRL Project for Konkan Railways Corporation Ltd.

2023

  • BIM Modelling For NCRTC various semi high speed metro station.
  • Green zone purposal for the electric vehicle station at sector 35 in Chandigarh
LessEditDelete
For more Information: Contact Us
Contact Us
 
Thank youYour Enquiry has been sent successfully.
© Kiranotech Engineering Consultancy Private Limited. All Rights Reserved (Terms of Use)Developed and managed by IndiaMART InterMESH Ltd.